top of page
MARINES PROJECTS
HMS docks, Portsmouth.
Investigated virtually all of the wharfs and jetties at the HMS Portsmouth. The testing was all FULL 3, investigations, including BC on all the major wharfs. The highlight being the successful berthing of the largest new ship in the UK fleet.
Loading wharf, Cockatoo Island.
FULL 3, with safe loading and BC and repairs required for 20+ year life.
2 main wharfs, Fremantle Port.
Testing of substructure for proposed new decking.
AJQ for Portsmouth CC.
FULL 3 on this wharf with steel timber and concrete piles, for safe
loading on the deck and future repairs.
loading on the deck and future repairs.
bottom of page